New Build Country House, Lancashire

Works are progressing well on site and the building has come a long way since the last update. All the floors are in ready for under floor heating and screed. The roof structure is complete and lead works, breather membrane and battens are going on in preparation for the slates. The coping stones are nearly all on and the finials arrived onsite during the visit, which look great. The first of the bronze windows are in and look fantastic against the cut stone window surrounds. Internally a lot of the first fix items are complete and the MVHR system pipes are going in (red pipes) which snake throughout the building providing fresh air.