Replacement Dwelling Harrogate - Completed

Started in September 2016 this 3 bedroom replacement dwelling was completed in December 2017. The combination of traditional stone for the buildings plinth combined with the zinc cladding wrapping over the top and large modern windows creates a fantastic looking dwelling in a great location.

Large open plan rooms combined with double height spaces and feature windows create a great internal environment for the client whether they are entertaining guests or just want to put their feet up and enjoy the views. A feature staircase in the main entrance creates a great focal point. The kitchen, bathroom and en-suites have been designed with a modern look and feature walls and light fittings add interesting features throughout. Another great project to be involved with and one which the client was very happy with the end product.

Replacement Dwelling Harrogate

Stuart was on site yesterday to visit the works at our replacement dwelling project on the outskirts of harrogate. The windows are now in and the exterior of the project is looking a lot more complete, with external lighting, downpipes and window flashings complete. Inside the boarding out for the plaster is well under way and the internal spaces are becoming a lot more visible. We cant wait for the next step and finishing items to start going in.

Site Progress - Replacement Dwelling Harrogate

The stone plinth is now complete and looks great. The timber frame at first floor level is also complete and ready to be clad in a standing seam Pigmento Brown Zinc by VMZinc. When walking round the dwelling we now get a feeling of the impressive double height and vaulted spaces with equally impressive views out over the surrounding countryside. M&E first fix is progressing well. Next job is the window installation.